Read Post

HBDA-T2: Final Construction

Posted on October 19, 2015
HBDA-T2: Final Construction
With the lifts working properly we finished skinning the exterior and installed the windows. The door was trimmed with 2 inch wide aluminum strips for an outside edge for the weather stripping. The split between the doors has weather stripping as w...
Read Post

Sierra Nevada de Santa Marta - Part 2

Posted on June 8, 2015
Sierra Nevada de Santa Marta - Part 2
In the morning everyone got up and lounged around. Mostly talking, about what, I couldn't tell. We planned to go up to the top of the mountain, but took a while to get everyone loaded into the vehicles and on the trail. The trail was fairly easy with a fe...
Read Post

Sierra Nevada de Santa Marta - Part 1

Posted on June 1, 2015
Sierra Nevada de Santa Marta - Part 1
After my return to Barranquilla, Hernando and some of his friends were planning a trip to Sierra Nevada de Santa Marta. Which, as you may have guessed, is near Santa Marta. Hernando getting some salsa at a mountain shop. Powering up roof ...
Next Page »